Turnpoints
- Details
- Last Updated on 19 May 2013
The list of turnpoints is released in the documents sections.
We still negociate with the authorities for the airspace (especially the part about Avord TMA areas).
We hope to publish the airspace file at the end of May
Local Procedures modification
- Details
- Last Updated on 13 April 2013
Release of the Local Procedures - edition 13/04/2013
At the recent meeting of the International Gliding Commission it was decided to extend the period of validation for IGC approved Flight recorders from 2 to 5 years, the amendment to Annex A does not take effect until October 2013 but the Plenum decided that this could apply to IGC events in 2013 if included in the local procedures.
The organisers of the WWGC at Issoudun have decided to make this addition to the Local procedures (see 3.5.4 a Additional documentation required).
Browse the documents section of the website to download.
A new building
- Details
- Last Updated on 09 March 2013
A new building is under construction at the airfield.
The building structure uses ecological materials, the walls are made of compressed straw panels.
Early March the walls were laid on the slab using a crane.
Below is a link to a photo galery of the operation.
Local Procedures
- Details
- Last Updated on 09 March 2013
The first edition of the Local Procedures is released.
Browse the documents section of the website to download.












